We’re pleased to have recently completed another pallet racking installation at London Gateway, expanding our customer’s existing storage system.
The project involved the installation of Dexion Speedlock pallet racking, using 11.1m x 1.1m frames with 2300mm, 2-tonne load beams. The extension included three double runs and one single run, providing the customer with valuable additional storage capacity while seamlessly integrating with their existing racking system.
Our experienced installation team completed the project safely and on schedule in just two days, ensuring minimal disruption to the customer’s operations. The new racking proved to be an immediate success, with the customer wasting no time in filling the additional storage space.
Whether you need to extend an existing warehouse system or install a completely new pallet racking solution, our team has the experience and expertise to deliver high-quality results, on time and to the highest safety standards.